Saturday, 8 December 2012

Shooting Schedule


Cast and Crew

Writers: Ellie Moore and Jessica Pye
Producers: Ellie Moore and Jessica Pye
Director(s): Jessica Pye
Director of Photography: Jessica Pye
Editor: Ellie Moore
Actor(s): Ellie Moore


Filming Schedule

Day: 03/12/12
Scene(s): Cards and guitar scenes
Location: Jessica's house
Equipment: camera, tripod
Costume: gold top, skull cream/black cardigan, black long leggings, hair pulled up in a bun
Props: cards, blue guitar

Day 04/12/12
Scene(s): Cards, keyboard, notepad writing
Location: Jessica's house
Equipment: Camera, tripod
Costume: N/A
Props: cards, notepad and pen, keyboard

Day 11/12/12
Scene(s): walking through forest, lipsyncing, shots of location
Location: Hainault Forest
Equipment: Camera, tripod
Costume: high-top trainer, leather coat, gloves, black leggings, striped scarf, mustache print top. Hair in a high bun and natural make-up
Props: N/A

Day 12/12/12
Scene(s): singing into mirror, dance shots
Location: Robert Clack Leisure Centre, Dance Studio
Equipment: Camera, tripod
Costume: Black leggings, grey studded jumper. Hair down and wavy, and natural makeup
Props: N/A


Day 6/2/13
Scene(s): Lipsyncing against a plain white background
Location: Jessica's house
Equipment: Camera, tripod
Costume: Black leggings,white top, Hair down and straight , natural makeup(more on the eyes)
Propers: N/A

Tuesday, 4 December 2012

Filming - 4/12/12


Today we filmed some different sections to our music video. I filmed Jessica playing different chords on the keyboard, we thought it would be best to use her as she plays it as an instrument, so the miming didn't look false or put on. However we made sure the shots didn't include her face so it wouldn't confuse people in the rest of the video. This section of filming we plan to edit with a black and white/monotone effect.

I also thought it would be a good idea to film Jessica writing out the music and lyrics to the song. We tried a few different angles with this and also tried to be very creative with the zooming in and out. I also filmed her drawing a simple heart on a piece of card, as I thought this could be a good ending for the video, although we may use it elsewhere.

We also filmed with the 'text cards' we had created before hand. We laid them out on the floor and tried various shots of them. Filming from different angles, filming individually and also filming with a pan shot so that the cards went in sequence to the lyrics of the song. 

After the filming session, we took pictures of all the props that we had used. We also came up with a new and creative idea for the video which we are going to try out very soon, but could be something that will take alot of thought and time to complete!

Here is some pictures of the props that we used today ....




Monday, 3 December 2012

Filming - 3/12/12

Today we started to film for our music video, for the very first time!

Today we filmed an inspired idea that we had , filming me holding up 'text cards' as the lyrics were sung on the song and chucking them away as they had been sung. We had already created these text cards, just with clear simple writing of the lyrics on them, we used fairly neutral colored cards. We tried this idea a fair few times, also trying it at different angles, with ideas like close ups , etc.

We then decided to film me miming playing the guitar. In our song there is a clear change of instrument in the song, and that marks the songs change in pace etc, from slow and emotional to upbeat and syncopated. So we though it'd be a good idea to use both these instruments in a shot even if it was only for a few seconds. We again tried different angles with these, it was a hard task for me personally as I'm no guitar player so without knowing what to actually play I had to improvise, so we did have to do a few takes of this miming.

Here is some pictures of the props that we used today....



Risk Assessment

Risk Assessment Sheet

Project: A2 Media 'Music Promo Video' Coursework
Writers: Ellie Moore and Jessica Pye
Producers: Ellie Moore and Jessica Pye
Director: Jessica Pye
Editor: Ellie Moore
Actor(s): Ellie Moore

Date: 03/12/12

Main Issues

Filming at:
Jessica's House
Robert Clack Leisure Centre, Dance Studio
Hainult Forest

Solutions:
Icy weather conditions- need to check for weather updates as well as wear appropriate shoes and clothing, and to check transport times 
Dance Studio- wary of visible wires, suitable footwear, be conscious of surroundings e.g. mirror
At house- wary of pets and any simple accidents e.g. water spills, make sure that the equipment set-up properly, aware of surroundings

Contacts:
Mr Johnson, at Robert Clack School (Green Lane), Media Studies 
Robert Clack Leisure Centre reception
Personal emergency contacts e.g. Mum/dad/ next of kin

Emergency Services:
On site services: First Aid at the Leisure Centre
Local Police: Metropolitan Police Station Dagenham, located at 561 Rainham Rd S, Dagenham, Essex  
Local Fire department: Dagenham Fire Station
Local Hospital: King George's and Queen's Hospital